The project involves the backfilling of approximately 100,000 cubic meters (m³) of approved material to achieve the required site levels. This includes grading and leveling of the site, ensuring uniform compaction and slope formation as per engineering specifications. The scope also covers site preparation, including clearing, removal of debris, and setting out the designated formation levels to establish a stable and level foundation for subsequent construction activities. All work is executed with strict quality control, moisture conditioning, and compaction testing to meet 95–100% modified Proctor density standards.